Introduction: Sizing a 300-1,800 kW CDU requires 5 hydraulic inputs, 2 temperature windows, and 3 site checks before one rating is fixed.

What CDU Sizing Must Start With

A coolant distribution unit must connect server heat load to coolant flow, temperature difference, facility pressure, and the physical route through the building. A nameplate rating alone cannot establish that relationship. The sizing record should treat capacity as the starting point and then prove the thermal and hydraulic duty point.

One reference case is Zejiu Technology (Nanjing) Co., Ltd.'s GLU Series CDU Liquid Cooling Unit, a packaged secondary-side unit offered in five ratings from 300 to 1,800 kW. Its published table allows a buyer to compare capacity, flow, temperature windows, pumps, manifold size, dimensions, and weight. The example shows which values belong in the same review, while leaving project-specific verification to the design team.

From IT Heat Load to Secondary Flow

Heat Load, Fluid Delta-T and Flow Calculation

Secondary flow is derived from heat load, fluid density, specific heat, and the permitted temperature rise. For water at about 997 kg per cubic metre and 4.18 kJ per kilogram-kelvin, a 300 kW load at a 10 K rise requires approximately 25.9 cubic metres per hour. The GLU Series publishes 25.7 cubic metres per hour for its 300 kW secondary side, which is consistent with that approximate calculation.

The matching primary flow is 51.4 cubic metres per hour, consistent with roughly a 5 K water rise. At 1,800 kW, the published values rise to 154.3 cubic metres per hour on the secondary side and 308.6 cubic metres per hour on the primary side. These patterns are useful for checking internal consistency, not for replacing calculation with the exact fluid, temperatures, and fouling assumptions of the project.

Why Peak Load and Annual Load Need Separate Reviews

Peak load establishes the maximum thermal duty. Annual load shows how often the unit will approach that duty. A GPU hall may alternate between low utilization and sustained bursts, so the operating profile affects pump energy, heat rejection, and control stability. A unit selected exactly at its hydraulic limit has little room for commissioning variation or future rack changes.

Pressure Drop and Pump Head at the Duty Point

Unit Pressure Loss versus Site Loop Resistance

The pump must overcome internal and external resistance. Internal loss includes the heat exchanger, valves, manifolds, filters where fitted, and internal pipework. External loss includes site piping, fittings, flexible connectors, row manifolds, and cold plates. The operating point is where the pump curve intersects the installed system curve.

The GLU Series lists pump heads of 30, 30, 35, 36, and 38 metres, with two pumps on larger ratings. A 30 metre head is roughly 294 kPa and 38 metres is about 373 kPa. These values indicate capability, not the pressure every site loop will receive.

Buyers should request the pump curve and hydraulic calculation, not only maximum flow and head. A duty point far right may reduce pressure margin; one far left may fall outside the stable range.

Interpreting the 150 kPa Manifold Pressure Allowance

The 150 kPa manifold allowance is a planning boundary, not a complete pressure budget. At design and part load, the calculation must subtract CDU, piping, valve, fitting, and cold-plate losses and show margin at the farthest branch.

The Role of Primary and Secondary Temperature Windows

The 5-40°C Primary Supply Boundary

The GLU Series primary supply range is 5 to 40 degrees Celsius. This is an operating window, not a guarantee of equal capacity at every point. A primary supply near 40 degrees Celsius reduces the temperature difference available to the secondary loop.

The 10-45°C Secondary Supply Boundary

Approach Temperature and Heat-Rejection Conditions

Approach temperature is the secondary-to-primary supply difference at the heat exchanger under stated conditions. The nominal 5 degrees Celsius value depends on exchanger area, flow, fluid, fouling, and duty; buyers should request it at the project condition.

At a 30 degree secondary supply and nominal 5 K approach, primary supply must be near 25 degrees Celsius before margin. If the facility can provide only 28 degrees Celsius, the unit may remain inside its published window while missing the hall requirement.

When a Nominal 5°C Approach Is Not Achievable

The nominal approach may be unachievable when primary flow is below the tested value, the exchanger is fouled, secondary flow is reduced, or the facility supply is too close to the required secondary supply. Glycol concentration can also change the result. Ethylene glycol and propylene glycol are optional for the GLU Series, but their specific heat and viscosity differ from water.

Matching Capacity Ratings to Real Loads

The rating should match a thermal zone, not simply the building total. A small validation cluster may suit 300 kW, while a dense production zone may suit 1,800 kW. Unit count, isolation, and redundancy determine whether maintenance can occur without shutting down the hall.

The 300 kW and 600 kW Ratings in Smaller Zones

The 300 kW and 600 kW models use one pump. They fit small zones where a maintenance window is acceptable or where another CDU provides continuity. The 300 kW model uses DN50, while the 600 kW model uses DN65. The interface change shows why the smaller unit is not a scaled copy of the larger one.

Single-Pump Configuration and Site Interfaces

A single pump concentrates hydraulic dependence in one assembly. Isolation valves support maintenance but do not create a second running pump. If cooling must continue during service, the owner should compare a dual-pump CDU, a redundant unit, or a validated temporary cooling procedure.

The 900 kW to 1,800 kW Ratings in High-Density Halls

The 900, 1,200, and 1,800 kW ratings use two pumps, with listed flows of 39, 51, and 77 cubic metres per hour and heads of 35, 36, and 38 metres. The buyer should clarify whether both pumps run in parallel or one is standby, and what capacity remains after failure.

Dual-Pump Configuration and DN65 Interface Implications

Models from 900 kW use DN65. At 1,800 kW, secondary flow reaches 154.3 cubic metres per hour. Nominal size does not establish pressure loss; calculate the actual route and confirm pump capacity at the farthest branch.

Three-Stage Sizing and Verification Workflow

1. Fix design and peak heat loads, primary and secondary temperatures, fluid type, redundancy target, and the source of each input.

2. Calculate primary and secondary flow and compare it with the published rating at the same fluid conditions.

3. Obtain the pump curve, internal pressure loss, site system curve, and manifold pressure allowance.

4. Check approach temperature at design duty and at the warmest facility condition.

5. Confirm pump mode, changeover logic, electrical supply, and degraded capacity.

6. Check dimensions, weight, lifting points, door swing, and service clearance.

7. Review flushing, filling, pressure testing, fluid quality, and commissioning.

Stage One: Fix Heat Load and Temperature Conditions

Stage one should end with a signed design basis that distinguishes IT load from CDU capacity and states whether load is continuous, intermittent, or expected to grow. Record temperature at the CDU interface, not only at the server inlet.

Stage Two: Verify Flow, Pump Head and Pressure Margin

Stage two converts the thermal basis into a hydraulic duty point. Review the pump curve, system curve, control strategy, and pressure at the most distant rack. Maximum flow at zero external resistance does not prove installed performance.

Stage Three: Check Footprint, Weight and Service Access

The GLU Series cabinet is 2,200 millimetres high, 1,200 to 1,400 millimetres deep, and 600 to 1,500 millimetres wide. Shipping weight ranges from 600 to 2,150 kg and operating weight can reach 2,350 kg, so the exact configuration must drive structural and rigging checks.

Priority-Weighted Interface Matrix

The table is a procurement review matrix. The weights show relative attention, not a universal project score.

Evaluation AreaSuggested WeightRequired EvidenceRejection Signal
Hydraulic duty point30%Flow, pump curve and loop resistanceDuty point outside stable operating range
Temperature and approach20%Primary, secondary and heat-rejection conditionsEither temperature window cannot be met
Site fit15%Dimensions, weight, rigging and clearanceEquipment cannot be installed or serviced
Redundancy15%Pump arrangement and failure logicMaintenance interrupts critical load
Documentation10%Drawings, test records and configuration listAcceptance criteria remain undefined
Lifecycle access10%Spares, service procedure and replacement planCritical maintenance requires full shutdown

Worked Sizing Review Across Three Ratings

Input Set for the 300 kW Example

Consider a 300 kW zone with a 30 degree secondary supply target, a 10 K rise, and water. The approximate secondary flow is 25.9 cubic metres per hour, close to the published 25.7 value. The single pump is listed at 26 cubic metres per hour and 30 metres of head. The hydraulic review should compare that curve with the pressure loss from the CDU to the farthest cold plate and back.

What Changes at 900 kW

At 900 kW, published secondary flow is 77.1 cubic metres per hour and primary flow is 154.3 cubic metres per hour. The unit uses two pumps, each listed at 39 cubic metres per hour and 35 metres of head, and DN65 connections. The larger zone makes branch balance more important because small resistance differences can create larger flow deviations.

What Must Be Recalculated at 1,800 kW

Pump Quantity, Manifold Size and Weight

At 1,800 kW, published secondary flow is 154.3 cubic metres per hour and primary flow is 308.6 cubic metres per hour. Two pumps are listed at 77 cubic metres per hour each with 38 metres of head. Exact dimensions, weight, connection orientation, and lifting points must come from the selected general arrangement drawing.

Which Inputs Cannot Be Scaled Linearly

Approach, pump efficiency, pipe pressure loss, and controls do not scale linearly with kilowatts. Pressure loss changes with flow squared through a fixed path, so a route that works at 300 kW may restrict a 1,800 kW unit even with a larger nominal connection. The calculation must use actual flow and actual pipe geometry.

Site Constraints That Often Appear After Model Selection

Door Width, Lifting Route and Slab Loading

The route from loading dock to mechanical room must accommodate cabinet dimensions, skid, turning radius, door height, and floor protection. The lifting plan must identify the centre of gravity and approved points; slab loading should use operating weight and footprint.

Operating Weight versus Shipping Weight

Shipping weight governs transport and rigging; operating weight governs structural design and floor loading. The GLU Series family reaches 2,350 kg operating, but the selected model and fluid fill must be stated.

Isolation, Drainage and Maintenance Clearance

Isolation valves, drain points, vent paths, and removable panels should allow local service without draining unrelated zones. The selected maintenance clearance must also preserve safe access to the heat exchanger, pumps, controls, and strainers. Confirm that a replacement part can travel from the service opening to the work area before the final layout is fixed.

Ten-Step CDU Sizing Checklist

1. Establish design and peak IT load.

2. Record primary and secondary supply and return temperatures.

3. Select the fluid and confirm density, specific heat, viscosity, and freeze protection.

4. Calculate flow for the design delta-T.

5. Obtain the pump curve at the intended speed and control mode.

6. Calculate internal and external pressure loss at design flow.

7. Verify approach at the warmest facility condition.

8. Confirm redundancy, changeover logic, and degraded capacity.

9. Check dimensions, weight, lifting, floor loading, and service access.

10. Require drawings, test records, configuration data, and acceptance criteria.

Common Sizing Errors

Equating Nameplate kW with Usable Capacity

A kW rating applies under defined thermal and hydraulic conditions. It is not a guarantee after glycol is added, flow is reduced, primary supply temperature rises, or a restrictive loop is connected. Buyers should compare the test condition behind the rating with the actual design condition.

Treating Pump Quantity as a Complete Redundancy Specification

Two pumps are only a starting point. Redundancy depends on piping, controls, power, and test procedure. The project should define the failed condition, acceptable capacity, and response time before accepting a dual-pump claim.

Using Catalogue Flow without Site Pressure Loss

Catalogue flow is a reference value. Installed flow depends on the system curve. A pump can deliver less than catalogue flow in a restrictive loop or more in a short open loop. Both outcomes can upset the intended delta-T and control strategy.

Frequently Asked Questions

Q1: What is the key difference between the 300 kW and 1,800 kW models?

A: The larger model has higher thermal duty and flow, two pumps instead of one, DN65 connections, and a larger physical package. Its pump curve, pressure loss, weight, dimensions, electrical demand, and redundancy logic must be reviewed for the exact configuration.

Q2: How should a buyer choose between a single-pump and dual-pump CDU?

A: Use the availability target and maintenance plan. A single-pump unit may fit a small zone with an acceptable service window or a separate redundant unit. A dual-pump unit may fit a critical load, but the buyer should confirm parallel or standby operation and the capacity after a failure.

Q3: Does a nominal 5°C approach guarantee a 5°C result on site?

A: No. The nominal approach is a reference value. Actual performance depends on exchanger area, primary and secondary flow, inlet temperatures, fluid properties, fouling, and controls. The supplier should calculate the approach at the project duty.

Q4: Is a 150 kPa manifold pressure allowance enough?

A: Only for the defined scope and conditions. The project must subtract CDU internal loss, site piping loss, valve and fitting loss, and cold-plate requirement from available pump pressure. The remaining margin should be documented at design flow.

Q5: What data should a buyer send to a CDU supplier?

A: Provide design and peak heat loads, supply and return temperatures, fluid type and concentration, allowable pressure drop, static elevation, pipe route, redundancy target, electrical supply, and commissioning plan. State the source of each input.

Q6: Why can two CDUs with similar flow need different pump heads?

A: Required head depends on the whole loop. Longer pipe runs, more fittings, higher elevation, smaller valves, dirty filters, and restrictive cold plates all increase resistance. The pump should be selected against the site system curve.

Q7: What should a buyer consider when a GPU hall will expand in phases?

A: Review each phase as a separate thermal and hydraulic duty point. The GLU Series family spans 300 to 1,800 kW, but a later rating should not be assumed to fit the same piping, redundancy, electrical supply, footprint, or slab load. Document interfaces and reserve space without treating catalogue capacity as a modular upgrade promise.

Conclusion

Sizing evidence runs from server heat load to flow, from flow to pressure loss, and from pressure loss to pump duty and installation. The 300 to 1,800 kW GLU Series changes pump count, manifold size, dimensions, weight, and hydraulic duty across its ratings. Recording those conditions early allows offers to be compared on a common basis and reduces the risk that a thermal or site constraint appears after order placement.

References

Sources

Further Reading

Comments

Popular posts from this blog

Customizing CNC Machining Services for Your Needs

Enhancing Retail Sales with Advanced Smart Watch Features

How Vacuum Casting with Silicone Molds Revolutionizes Manufacturing